I am testing creating a 'map' using a contour interval for each 7-1/2 minute area as is used on the printed USGS 24K quad map. This would allow the maximum detail from the source data without 'overcontouring'.
Do you think a changing CI (to reflect the topography) would be useful, or would you find it confusing, etc?
Attached is a gmapsupp.img file (in overlay/transparent mode) for the Blanca Peak 100K (30x60') quad in southern Colorado (LR corner at 105W & 37.5N) where the 32 component 24ks use 5, 10, 20 & 40 foot CIs.
Your comments would be appreciated.
Do you think a changing CI (to reflect the topography) would be useful, or would you find it confusing, etc?
Attached is a gmapsupp.img file (in overlay/transparent mode) for the Blanca Peak 100K (30x60') quad in southern Colorado (LR corner at 105W & 37.5N) where the 32 component 24ks use 5, 10, 20 & 40 foot CIs.
Your comments would be appreciated.